PROJECT

Castle Oaks Public School

Project Hero Image

Overview

Marking a milestone in modern school construction, TORCOM Construction Inc. delivered a 70,000-square-foot, two-story facility at Castle Oaks Public School. Designed to foster a vibrant learning environment, the project also included extensive site enhancements and landscaping.

Scope of Work

The school’s exterior blends brick, stone veneer, cement board paneling, curtain walls, and architectural metal panels for a striking appearance. Structurally, it incorporates concrete footings, load-bearing masonry walls, precast hollow core slabs, and a three-ply bituminous roofing system.

The surrounding site features concrete sidewalks, curbs, an irrigated soccer field, and heavy-duty asphalt paving for the play area and parking lot. Lush landscaping with trees, shrubs, and sodded green spaces adds aesthetic appeal. Interior and operational enhancements include a perimeter radiant heating system and a gas-fired generator for emergency preparedness.

Project Information
Client Icon
Client
Peel District School Board
Location Icon
Location
155 Castle Oaks Cross, Brampton, ON L6P 3V4
Date Icon
Start Date
October 1, 2014